Case Studies
Filter Categories
Filter – All
Infrastructure
Bridges & Structures
Car Parks
Flood Defence
Highways
Industrial & Commercial
Special Works
-
Silverthorne Lane WalkwaySilverthorne Lane Walkway is located to the east of Bristol City Centre, running parallel to the Feeder Canal. The project comprised the construction and installation… -
Dawlish HIF InfrastructureMontel Dawlish HIF Infrastructure Dawlish HIF is the construction of a new 26m span bridge and 110m of carriageway on the embankment, including construction of footways and… -
The Strand, TorquayMontel The Strand, Torquay Public Realm Works The Strand is a Public Realm project, adjacent to the harbour in the heart of Torquay. The purpose of the… -
University Hospital Coventry and WarwickshirePrime PLC appointed Montel to construct a secure 1600 space car park to increase parking capacity for the hospital, and to improve access for emergency… -
New Yard and Storage AreaConstruction of a new fuel distribution facility including a concrete paved hardstanding area suitable for rigid and articulated fuel tankers who could load and unload… -
Callow StourportUpgrades to a bulk fuel storage and distribution facility within the flood plane of the River Severn, to ensure reduced risk of spills from the… -
Jacobs Douwe Egbert Separation WorksDesign and Construction of a new road and associated works including lorry park for 15No Articulated Vehicles and 9No Rigid Vehicles on a working and… -
GWSR Bridge 8Heritage railway bridge renovation works – steelwork and brickwork repairs, bird mesh and fencing. Bridge 8 had restricted traffic loads imposed after inspections highlighted corrosion… -
Bewdley Town Centre Car Park ExtensionThis Design & Build Contract was for the construction of a New Car Park at the Site of the Former Medical Centre and Library between… -
Seedy Mill Water Treatment WorksMontel provided the building, civil engineering, and groundwork elements of Project Roxane. Our scope included the provision of enabling works, concrete slabs, a control building,… -
Myton Green Strategic Infrastructure WorksMyton Green Development is situated to the south west of Leamington Spa. The work comprised of the new access off the A452 Europa Way, 800… -
Whittle Gardens, Innsworth, Strategic Infrastructure WorksThe infrastructure works comprised of the construction of approximately four kilometres of foul and storm water sewer (at depths of up to seven metres), the… -
A452 Europa Way S278 WorksThe works comprised of highway upgrades to the A452 Europa Way in Leamington Spa. The works included the “Dualling” of approximately 700m of the existing… -
Coopers Edge Flood DefenceConstruction of a new drainage channel that would form an overflow outlet should the adjacent water course flood in periods of heavy rain. This necessitated… -
Twigworth Roundabout and Access RoadThe construction of a new roundabout on the A38 to the north of Gloucester, just outside of the village of Twigworth. This road forms an… -
Somerdale S278 WorksThe works included access junction improvements works, reconfiguring of retaining wall, truncating Priory Road and creation of new turning head, altering Chandos Road, widening Somerdale… -
Sandwell Flood Alleviation SchemeConstruction of flood alleviation works to the volatile Brandhall water course within the Brandhall Golf Club which is located in Oldbury, West Midlands. The scheme…
