Case Studies

Filter Categories
Filter – All
Infrastructure
Bridges & Structures
Car Parks
Flood Defence
Highways
Industrial & Commercial
Special Works
  • View Project
    Barr Beacon Reservoir
    Montel Special Works team were invited to tender for a flow meter chamber installation on one of the most strategic sections of water main in…
  • Montel Final Project Image C&WUH
    View Project
    University Hospital Coventry and Warwickshire
    Prime PLC appointed Montel to construct a secure 1600 space car park to increase parking capacity for the hospital, and to improve access for emergency…
  • View Project
    New Yard and Storage Area
    Construction of a new fuel distribution facility including a concrete paved hardstanding area suitable for rigid and articulated fuel tankers who could load and unload…
  • View Project
    Callow Stourport
    Upgrades to a bulk fuel storage and distribution facility within the flood plane of the River Severn, to ensure reduced risk of spills from the…
  • View Project
    Jacobs Douwe Egbert Separation Works
    Design and Construction of a new road and associated works including lorry park for 15No Articulated Vehicles and 9No Rigid Vehicles on a working and…
  • View Project
    GWSR Bridge 8
    Heritage railway bridge renovation works – steelwork and brickwork repairs, bird mesh and fencing. Bridge 8 had restricted traffic loads imposed after inspections highlighted corrosion…
  • View Project
    Bewdley Town Centre Car Park Extension
    This Design & Build Contract was for the construction of a New Car Park at the Site of the Former Medical Centre and Library between…
  • View Project
    Seedy Mill Water Treatment Works
    Montel provided the building, civil engineering, and groundwork elements of Project Roxane. Our scope included the provision of enabling works, concrete slabs, a control building,…
  • View Project
    Myton Green Strategic Infrastructure Works
    Myton Green Development is situated to the south west of Leamington Spa. The work comprised of the new access off the A452 Europa Way, 800…
  • View Project
    Whittle Gardens, Innsworth, Strategic Infrastructure Works
    The infrastructure works comprised of the construction of approximately four kilometres of foul and storm water sewer (at depths of up to seven metres), the…
  • View Project
    A452 Europa Way S278 Works
    The works comprised of highway upgrades to the A452 Europa Way in Leamington Spa. The works included the “Dualling” of approximately 700m of the existing…
  • View Project
    Coopers Edge Flood Defence
    Construction of a new drainage channel that would form an overflow outlet should the adjacent water course flood in periods of heavy rain. This necessitated…
  • View Project
    Twigworth Roundabout and Access Road
    The construction of a new roundabout on the A38 to the north of Gloucester, just outside of the village of Twigworth. This road forms an…
  • View Project
    Somerdale S278 Works
    The works included access junction improvements works, reconfiguring of retaining wall, truncating Priory Road and creation of new turning head, altering Chandos Road, widening Somerdale…
  • View Project
    Sandwell Flood Alleviation Scheme
    Construction of flood alleviation works to the volatile Brandhall water course within the Brandhall Golf Club which is located in Oldbury, West Midlands. The scheme…