Prime PLC appointed Montel to construct a secure 1600 space car park to increase parking capacity for the hospital, and to improve access for emergency vehicles. This project included the installation of 34 active Electric Vehicle charging spaces and 56 passive charging spaces.

 

This project was undertaken on a site susceptible to flooding and the installation of drainage systems and attenuation basin has ensured the risk of flooding has been mitigated.

£ 0 m
0 weeks
Montel

Key Processes

 

  • Major earthworks with over 26,000m3 of surplus soil being removed offsite.
  • Installation of surface water drainage systems and attenuation basin.
  • Over 6000m of ducting installed.
  • Importing of 21,250m3 of capping and sub-base material.
  • Installation of flood telemetry systems on the two watercourses to monitor          water levels.
  • Installation of EV charging spaces.
  • Formation of new entrances into the car park.
Montel

Key Processes

  • Concrete protection works for the existing sewage system.
  • Construction of access road and footpaths.
  • Installation of signage, roadmaking’s, barriers, 106 streetlight columns, 10 CCTV masts 8 ANPR Camera systems.
  • The scheme was within a working hospital site and a residential area stakeholder engagement has been an important element of this project.