Somerdale S278 Works

The works included access junction improvements works, reconfiguring of retaining wall, truncating Priory Road and creation of new turning head, altering Chandos Road, widening Somerdale Road, installation of traffic light system, two controlled pedestrian crossings, streetlights and signage, altering Priory Road and Chandos Road junction. New Cycle Link.

£ 0 M
0 weeks
Montel

Integrated Delivery Team

The scheme comprised of a new traffic-signalised junction on what had previously been a five-way interchange (that had once formed the entrance to the Fry’s Turkish Delight factory)

With our extensive experience and proactive approach, the site team brought together the various facets of the design and through direct liaison with the local authority and each of the four designers ensured that the Works were constructed in general compliance with the drawings, but also to their adoptable standards.

As a solution-driven contractor, we saw it as our role within the integrated delivery team to identify, solve, and drive solutions through the scheme – in order to provide our client with a stress-free project.

Montel

Adopting a Collaborative Strategy

Working within very restricted working areas due to the necessity to maintain at least single lane traffic through the works and the presence of Keynsham train station directly opposite the Works area with the constant flow of pedestrians and vehicles accessing and egressing the station and its car park, it was important that the various works and specialist trade contractors were co-ordinated with regards to both logistics and health & safety concerns.

Montel

Encouraging Innovation and Learning

Through the sharing of intelligence, innovations and best practice, our delivery team was well-equipped to mitigate risks to time, cost and quality, whilst ensuring the customer requirements were incorporated into every aspect of scheme delivery.